|
|
| Title |
Plenary meeting of the Reconstruction Implementation Commission for Orthodox Religious Sites in Kosovo (RIC) |
| Description |
Within the framework of the Regional Programme for cultural and natural heritage in South East Europe [Component B - Integrated rehabilitation project plan / Survey of the architectural and archaeological heritage (IRPP/SAAH) jointly implemented by the CoE and the EC], the Chairwoman of the RIC participated in the plenary meeting of the Reconstruction Implementation Commission for Orthodox Religious Sites in Kosovo (RIC). |
| Status |
Completed |
| Date |
16/05/2006 - 20/05/2006
|
| Location |
Pristina, Kosovo* |
| Countries |
Others:
Kosovo*
|
| |
Bilateral |
|
Joint Programme EC/CoE |
|
JP |
IRPP-SAAH 2 - Culture 2000 - Integrated Rehabilitation Project Plan - Survey on Architectural and Archaeological Heritage in SEE - second EC/CoE Covenant 2004-2006
(Logframe) (Activities) |
|
Project Purpose |
2 - 2004/DG4/JP/1570 IRPP-SAAH 2 - Rehabilitation of Heritage in Kosovo |
|
Expected Result |
2.1 - Rehabilitation of religious heritage damaged in 2004
|
 |
Council of Europe Programme of Activities |
| Line of Action |
⇒ 7
Promoting European cultural identity and diversity |
| Programme |
☆ 7.3
Sustainable development |
| Project |
2003/DG4/111 Development of communities through cultural heritage |
| Expected Result |
1 The Regional Programme for Cultural and Natural Heritage in South-East Europe is implemented successfully |
Working Method |
Expert Meeting / Expertise |
| Directorate (Service) |
Education, Culture and Heritage, Youth and Sport (Directorate of Culture and Cultural and Natural Heritage) |
| CoE Contact |
DE THYSE, Mikhaël
email |
Web Pages
Documents & links |
1 http://www.coe.int/heritage/tcu |
| Last Modified |
27/06/2006 |
Activity Synopsis
(ID# 15423)
(Hide Synopsis)
|
| Objective(s) |
Participation of the Chairwoman of the RIC in the plenary meeting of the Reconstruction Implementation Commission for Orthodox Religious Sites in Kosovo (RIC) |
| Output/Results |
Signing of the RIC Terms of Reference
Preparation of the Programme for Tenders
Preparation of procedure for paying RIC Commission members
Meeting with French/German liaison office in Pristina regarding donation for reconstruction of specific sites. |
| Conclusions/Follow Up |
RIC meeting to agree the specifications.
Meeting with UNMIK to discuss supervisors' salaries.
Liaison with RIC and French/German liaison office in Pristina. |
| Participants |
RIC Chair
RIC Project Manager
Commission members (4)
UNMIK representatives (2)
MCYS (2)
French/German Liaison Office, Pristina (3)
|
| Consultants/Experts |
RIC Chair
RIC Project Manager
|
| CoE Secretariat |
Support was provided by the Technical Cooperation and Field Action Unit |
| Total No. Participants |
13 |
Last Modified
|
10/01/2007 |