Joint Programmes - Logframes and Activities

(Joint Programmes)
Kyiv RegProg-2nd Cvt   Kyiv Initiative Regional Programme: 2nd Covenant - Pilot Project for the rehabilitation of cultural heritage in historic towns
Showing only one 'Project Purpose'
Narrative (Work Plan)
01/12/2010 - 30/11/2011
JP Completed  
Coordinating DG:
Education, Culture and Heritage, Youth and Sport
200 000
Documents/Links:
Intervention Logic Performance Indicators Sources of Verification Assumptions
Overall Objectives Assist national, regional and local authorities in implementing a ''Strategic Intervention Plan'' for the revitalisation and the social and economic sustainable development of small and medium-sized historic towns and their immediate surroundings.
 

 

 
Project Purpose 1      2010/DG4/JP/2389   Kyiv Initiative Regional Programme: 2nd Covenant - Pilot Project for the rehabilitation of heritage in historic towns 200 000 
(14 Activities) Narrative
Assist national, regional and local authorities in implementing a ''Strategic Intervention Plan'' for the revitalisation and the social and economic sustainable development of small and medium-sized historic towns and their immediate surroundings
completion of the Preliminary Phase; setting up of the operational conditions for the Operational phase: 45 general surveys on priority intervention towns published; 30 pilot towns selected; Diagnosis of the Pilot Towns published; Coordination and management structures strengthened.  interministerial commissions and local technical teams set up in each country; number of candidate towns and level of mobilisation at national and local levels; Project coordinators' reports; international experts' reports; international partnerships consolidated  Global budget secured (external partnerships and voluntary contributions); political and technical direct involvement of the different institutional levels in the countries; willingness of the participating countries to share best practices 
Expected Result 1.0 mm

 
Expected Result 1.1 Coordination ensured between the five countries in order to define and adapt the methodology and management structures are set up for implementing activities.
2 coordination meetings are organised with the national project Coordinators and Project Managers; the extensive use of the collaborative platform as management tool; annual action plan (2011) adopted and adjusted; technical terms of references elaborated, revised and adopted for implementation; nomination of Project Managers in the countries, as well as local technical teams for each of the pilot towns.

Aide Mémoires of the meetings; the five action plans 2011; the collaborative platform; the terms of reference for the Towns Reference Plan (Appendix B on preliminary technical file and Appendix C on analysis of urban and heritage resources); composition and number of the national professionals involved in the local technical teams.
 
political support provided by the Ministers of Culture; mobilisation of other Ministries;number and quality of professionals from the pilot towns mobilised.
Expected Result 1.2 Thematic workshops are organised in all participating countries to train the local technical teams set up in Pilot Towns.
2 thematic workshops organised in one Demonstration Town in each country in order to train the members of the pilot towns local technical teams for the elaboration of the pilot towns; Diagnosis (preliminary technical file and analysis).

the working files elaborated by the five Demonstration Towns; the technical reference documents finalised; the number of national professionals trained during the workshops.
 
the right choice about the participants in the workshops; mobilisation of the municipalities; synergies between the different sources of contribution.
Expected Result 1.3 The heritage and urban resources in the pilot towns are assessed and the main urban development issues at stake / challenges / problems related to the future development strategies are identify.
the preliminary technical files are elaborated in each of the pilot towns; the analysis are conducted in each of the pilot towns; the Diagnosis reports are presented and approved at national level.

the preliminary technical files elaborated by the pilot towns and validated by the international experts; the analysis report elaborated by the pilot towns and validated by the international experts; the Diagnosis reports.
 
complete endorsement and understanding of the methodology elaborated; sufficient communication and exchange between the different levels of experts in each countries and with the international experts; respect of the deadlines by the local teams.
Expected Result 1.4 a communication strategy is implemented in the five countries in order to raise awarness and consolidate the political back-up and partnerships for the project.
a web page is developed on the Council of Europe site; dedicated web pages are created in countries; brochures are published in each of the countries for presenting the 45 priority intervention towns; promotion of the project during international events.

the five national brochures; the pages web devoted to the project; international events where the project is promoted.
 
understanding about the need and the usefulness of a good communication strategy to promote the activities, but more importantly to convince partners to remain mobilised for the next stages.



 